2010-08-16 - YDC MONTHLY UNION MANAGEMENT MEETING

Consultation Minutes
-between-
Canada Post Corporation (CPC)
-and-
Canadian Union of Postal Workers (CUPW)
Held on August 16, 2010 at YDC
Scarborough Local Monthly Consultation Minutes

For the CorporationCPC For the Union
K. Aggarwal M. Duquette
L. Aitchison L. Charles
Y. Sluchenkov C. Beth

EFM – Closed

Security – Status Quo

CPC will R&R for an update.

Equal Opportunity List

CUPW: There is an issue with the current P04 list. There may not be a loop list posted.

CPC: Will review this list. It may need to be reset.

Temp Coverage/Pension Issues – Closed

New Streets/POC

CPC: Information was sent to RMO. We will follow up to find out the assigned LDU and to see if they will be structured into YDC loops.

CUPW: We previously provided the street names and some address information.

H&S Glass Case – Closed

2010 Full Restructure

CPC: Waiting for information on this. You will be given the required 10 days notice.

CUPW: January is the tentative date for the restructure implementation. There is a national agreement on what is considered as a tour change and provides the criteria for what is an update and what is a restructure. If your position is that it is not a restructure then we will be filing a grievance.

You need a union observer present with you during this process. There is work being moved from tour to tour and the start times are changing. This is defined for LC but will check for MSCs.

CPC: All information is being sent to you as it comes available on all tour changes in YDC. These changes are regular changes not restructure.

Bar Charts

CPC: Will review in one month.

Backfills

CUPW: Information provided does not indicate whose position is being backfilled. Would like position number of position being backfilled, who owns that position and who is backfilling the position.

29.03b) Tech Change Notice NRCS – Postal Transformation

CPC: We will have mini-meetings with employees. Go Live is scheduled for September 27, 2010.

CUPW: There is a health and safety issue with individuals touching the screen.

CPC: There are hand sanitizer dispensers throughout the work floor.

Flex Part-Timers

CUPW: The Flex hours have been increased from 4 to 5 hours per day. These changes must be made through consultation with CUPW and an observer must be present.

Review Article 46.05 which refers to 47.16. Have more than 50% of the duties changed? If so, the tours need to go up for bid.

CPC: None of the tours are changed more than 50% at any time during the regular tour changes.

PDSL

CUPW: If someone is absent the routes are disappearing or zero’d off and divided amongst other tours.

Next Consultation tentatively scheduled for September 23, 2010 at 9:00am.