Y.D.C., February 17, 2004
On February 17 2004, the Parcel Model Project Route
Sampling continued at the YDC. There were a number of problems with the first day, but
the 2nd day was better.
Below is a series of images from the YDC and a short
description.
Double Clicking on a Picture will make it go Full Screen!
Y.D.C., February 17, 2004
In this picture we see
the layout of the racks for a tour in a loop for sequencing. This one has
three racks and a flatbed (C-8)
(Double Clicking on a Picture will make it
go Full Screen!)
In this picture we see
another layout of the racks for a different tour in a loop for sequencing.
Regular parcels are placed on racks, while heavy or oversized parcels are placed
on flatbeds (C-8).
(Double Clicking on a Picture will make it
go Full Screen!)

his picture we see two racks
and a flatbed (C-8) for one route, and a shared binnie used for two routes.
This is another layout of the racks and flatbed. The final design to be
used is still to be determined.
(Double Clicking on a Picture will make it
go Full Screen!)
This is the other tour in the loop.
(Double Clicking on a Picture will make it
go Full Screen!)
This shows the construction taking place at the YDC at
this time. This is where the induction and keying will take place.
The electrical panels currently will be moved, once they are refitted,
(Double Clicking on a Picture will make it
go Full Screen!)
This is one of the two electrical panels being refitted
for use at the YDC. Reconstruction of the belt will start shortly.
Note the yellow tape on the floor indicating the location of portions of the new
belts.
(Double Clicking on a Picture will make it
go Full Screen!)
This shows both of the electrical panels being refitted.
Once refitted, they will be moved, as they currently sit where the induction and
keying will take place. This picture is taken from where the run of the
different lanes will be, as indicated by the yellow tape on the floor.
(Double Clicking on a Picture will make it
go Full Screen!)
This is a mono of parts to be installed in the parcel
sortation machine. This collection of "garage sale" parts will be
assembled and running by June 2004 according to CPC, on site construction will
start in March 2004.
(Double Clicking on a Picture will make it
go Full Screen!)