07/01/23
The Corporation said
they needed to identify PDSL issues, identify average MSCs for sampling,
prepare training for MSCs and Supervisors (Best Practices, SOLID),
identify sequencing and delivery issues, multiple suite buildings with
one point of delivery (mailroom) and off-load process as well as start
and end of shift procedures. They will provide the Engineer study
results re: offloading.
07/03/01
The Parties discussed
providing loop planners for PDSL.
The Union asked if sort
plan issues needed to be changed by Innovapost.
The Corporation said
that the RMOs made the changes here remotely.
The Union was concerned
that there could be ongoing issues with respect to system changes.
The Corporation replied
that there was no reason for Innovapost to override changes made by the
Corporation to PDSL. (closed)
07/03/01
No recent issues.
Closed.
07/02/12
CPC: Engineering study
results available not detailed enough.
Union: New Collective
Agreement has language to allow PO4’s to offload trucks.
The Parties agreed to
defer offload time study discussion.
07/03/01
Closed
Union: Once PDSL assigns
work Flex tours schedule should be set. They should not be forced to
work for 8 hours.
CPC: Flex workload needs
clarification at National level.
07/03/01
Ongoing
Union: raised concern
that tour sheet updates need to be distributed to the drivers in a
timely manner.
CPC: Tours sheet updates
on CPU are up to 48 hours behind actual effective date based on new
driver pick-up process. YDC will ensure process reinforced for updated
tour sheet from RMO to be distributed to impacted tours timely.
07/03/01
CPC: Process has been
addressed.
All master files have
been updated. Suggested all files be reviewed on a regular basis. Will
develop a process.
(Closed.)
Union: Delivery
community need to raise system issues to RMO and follow the process to
get these issues resolved.
CPC: Carla to raise this
issue to Delivery directors.
CPC: RMO to provide
delivery area back up (latest 038) by Feb 22nd.
CPC/Union: agreed that
union observers, RMO and supervisor to meet on Feb 22nd at
09:00 at 280 Progress to decide tours to be sampled.
07/03/01
Will provide by March 8th,
2007.