|
|
Restructure Start Date |
|
|
07/06/08
For the purposes of bidding, the
Parties agreed that the first date of the restructure process will be
June 11th, 2007 (the employees who were assignment holders as
of Monday, June 11th, 2007 will be entitled to first round
bidding).
The Corporation to provide a list of
employees to the Union be next Wednesday, June 13th, 2007
(done).
07/06/29
The Corporation reiterated that the YDC
restructure would be implemented in November 2007. Would like to
implement it sooner therefore they will work with the group who make the
SAP inputs to accelerate the process. |
|
Action Items |
1- Restructure dedicated resources |
|
|
07/03/01
Closed |
|
|
2 – Volumes |
|
|
07/06/08
The Parties agreed to pull volumes from
June 1st.
07/06/29
The volumes are from May 26th,
2006 to June 1st, 2007.
The Corporation advised the Union that
a fix was made in IRMA to correct the issue with the log file and that
the volumes will be run.
The Union asked that the data be run on
Tuesday, July 3rd when the Union Observer is available.
The Corporation agreed.
The Union asked if the restructure
activities would commence immediately after the data was run.
The Corporation explained that once the
volume data was run they would rebalance loops, resequence loops and
then restructure (process shared and attached to minutes).
The Union asked how many tours would be
restructured at once in order to determine how many observers would be
required.
The Corporation responded that they
hope to have two (2) teams of two (2) RMOs – they will review the
availability of resources. |
|
|
3 – Offload study |
|
|
07/06/08
The Parties agreed that the offload
study would be conducted in February 2008. The Parties will agree to an
interim value to use in the restructure.
07/06/29
The interim value will be determined at
a separate meeting. Offload will be done at the same time as the
sampling in March-April 2008. |
|
|
4 - Sampling |
|
|
07/06/29
Will be done on March-April 2008. |
|
|
5 – Drive-Times |
|
|
07/03/01
Ongoing |
|
|
6- Pick-up Procedures |
|
** |
Bills of lading have
changed. New procedures will be rolled out. The Corporation to confirm
implementation date. |
|
|
7 – Pick-up and Clearance Design and
Start Times |
|
|
07/06/08
The Corporation does not want to create
a high number of split shifts therefore will not go forward with
creating waves of start times. Will continue to look for solutions for
having face-to-face discussions with MSCs.
07/06/29
Ongoing |
|
|
8 – Loop Q (Move to 1
Yonge) |
|
|
07/06/08
The Union asked if the Corporation
would consider bringing the Malvern (M1X) parcels to the YDC in the
restructure exercise.
The Corporation responded that the
parcels are currently being structured into Scarborough Depot 4.
Regional Consultation was held on June
22, 2007.
Ongoing
07/06/29
Union indicated that their request was
to offset the loss of Loop Q and to avoid a surplus situation.
The Corporation reiterated that there
are no plans to bring in the additional work to the YDC. |
|
|
9 – Freighter Network and Non-loop
Delivery
|
|
|
07/03/01
Ongoing |
|
|
10 – Communication Plan |
|
** |
Posters are ready and available. Will
provide. |
|
|
11 – 0 Codes |
|
** |
07/04/24
Ongoing
Process not yet completed, but all “0”
codes will be incorporated.
Closed |
|
|
13– Tour Descriptors |
|
** |
It is the Parties understanding that an
agreement was reached at the Steering Committee to make one (1) change
to the sheets: remove the number of stops on tour sheets. |
|
|
14 – Weekend Operations |
|
|
07/06/08
WPDH weekend tours: study. Will
review results of the study (volumes) and share the findings.
07/06/29
Ongoing |
|
|
17 - Quality Checks |
|
|
07/04/24
Union: Said they were interested in
the keying information at the YDC in order to work towards Pilot 1.
CPC: Will provide.
Union: WPDH has significantly reduced
their keying errors. Very positive. Need to quantify in order to
assess the error level.
CPC: Will provide update at the next
meeting. |
|
|
19 – RPO Pick-Up Times |
|
|
07/04/24
Union: Asked if there was resolution
to the logged problem ticket.
CPC: Problem can’t be corrected
however, will review with person who logged ticket and reply. |
|
|
20 - RPO Clearance Time |
|
|
07/04/24
CPC: Issues were raised by the drivers
and the Union observers. Provided a RPO Clearance time overview.
Union: Issue is that MSCs cube their
trucks and have no more room for the mail from the other RPOs on his
tour or the SLB mail. Need to determine who does the pre-clearance and
who does the clearance.
CPC: Tour sheets say to clear all mail
and equipment from the RPO.
Union: It is not the MSC’s
responsibility to clear all the mail at the RPO. It is their
responsibility to clear the PC and Xpresspost only.
CPC: 1430 hrs is a clearance, to clear
all available mail at the RPO. It is not to support one clearance or
another, it is to support the processing in the plant. If an MSC is
cubed, you must bring it to the RMO’s attention and verify. Issues will
be addressed.
Union: Asked that the procedure when
an MSC is cubed should be posted in the Information Books.
CPC: It is in the MSC handbook, but
will post in the Information Book. |